Testing

We measure first.
Then we train.

A 3D movement scan and a full body composition analysis — both included in your $75 consult.

Your body, by the numbers.

Two short scans show us how you move and what you're made of — so your program is built around your body, and every gain from here has something to measure against.

  • A plan built for you

    Your coach writes your program from your own results.

  • Explained in plain language

    Every number walked through simply, starting with what's already going well.

  • Progress you can see

    Retest every eight weeks and compare your results side by side.

Mobile fitness app displaying single exercise report for overhead squats, with technique scores in stability, mobility, alignment, and stability.
Mobile fitness app displaying single exercise report for overhead squats, with technique scores in stability, mobility, alignment, and stability.

Valor Vision

3D movement scan

Markerless 3D motion capture from a tablet — no sensors, no suits, no lab. You move through a few simple exercises, and in under five minutes we can see what the eye can't.

It's the same movement-analysis platform used by professional and college sports teams, and it gives us a clear, objective picture of how your joints move and where one side is doing more work than the other.

What it measures

  • Movement quality scores
  • Joint angles and range of motion
  • Side-to-side differences
  • Mobility and stability

What you walk away with

  • Your scores, strengths first
  • A simple read on each joint
  • The one thing we'll build first
  • A baseline to replay side by side at your retest
Close-up of a person holding a digital blood glucose monitor displaying 91.53 mg/dL, timestamped at 8:15 p.m. with various health metrics, in black-and-white.

Scale MD Pro

Body composition & metabolism

An 8-electrode body composition scan — hands and feet — that breaks your weight down into muscle, fat, and water, including your arms, legs, and trunk separately.

From your actual lean mass, it estimates your resting metabolism, which gives us a far better starting point for calorie and protein targets than a height-and-weight calculator.

What we look at

  • Body fat % and muscle mass
  • Visceral fat — the fat around your organs
  • Body water
  • Estimated resting metabolism and metabolic age
  • Left vs. right, arms, legs, and trunk

How we use it

  • Your numbers, explained simply
  • A starting point for nutrition, if you want it
  • A daily water goal if you're running low
  • Trends every eight weeks, not one weigh-in

Oxiline reports body fat readings within 4.7% of DEXA scans. Retesting every eight weeks shows you the trend, not just a single snapshot.

What to expect

Both scans happen inside your 60-minute consult. Here's how to get the most accurate read.

Before you come in

  • Drink water as normal — show up hydrated
  • Skip a big meal or hard workout for 2–3 hours before
  • Wear clothes you can move in
  • Be ready to step on the scale barefoot

Good to know

  • Body composition is for ages 18 and up
  • Pregnant, or have a pacemaker or other implanted device? Tell us and we'll skip the body comp scan
  • Members can retest every 8 weeks
  • Your results stay with your coach and in your app

Find out where you're starting.

Both scans, a movement assessment, and a clear plan — all in one 60-minute consult.

$75 · 60 minutes · No pressure to sign up for anything.